A.S. King Power Plant

Bayport, MN

Augered Cast-in-place piling overcome adverse soil conditions at a power plant addition.

The soils beneath a 560 megawatt coal fired power plant located in Stillwater, Minnesota consisted of sands, gravel, cobbles and peat layers overlying weak sandstone bedrock. Continuous flight augers advanced through this 20’ of overburden soils and then went 22’ into the sandstone to form 44’-0” piles. A total of 750 piers, carrying 400k ea were installed to support an upgrading of the plants Air Quality Control System (AQCS).

Construction Manager: Lunda Construction Company
Engineer: Black & Veatch




CONTACT INFORMATION

If you have any questions regarding our services, please contact us.

Case Foundation Company
1325 West Lake Street
Roselle, Illinois 60172

Phone: 630-529-2911
Fax: 630-529-2995
Email: info@casefoundation.com

© 2007 Case Foundation Company. All Rights Reserved.
Site Design by Lakeshore Concepts