Case experimented and succeeded in using a large-scale European hydraulic drill rig to install deep rock socketed caissons with heavy, full length permanent steel casings.

The project

The Cleveland Convention Center & Hotel was planned to be the latest addition to the Cleveland Skyline. The foundation is supported on 29 drilled shafts socketed into the Devonian shale formation, which was encountered about 175 feet below grade.

The challenge

Case Foundation used specialized drilling equipment to install extremely heavy and oversized permanent steel casing, in sections, into top of shale. This equipment excavated deep rock sockets in hard shale with compressive strengths up to 5,000 psi.

The solution

A Bauer BG40 and crane mounted large drill attachment were used to install the permanent casings and reach the 190 foot shaft depths. The full length permanent casings were up to 8.5 feet in diameter and seated into shale. Shaft diameters ranged from 3 feet to 7 feet and 6 inches. The design rock sockets were as much as 16 feet in depth. Crews placed over 150 tons of reinforcing steel and 5,000 cubic yards of concrete over a span of 2 months to complete this project on schedule.

Project Facts

Owner

City of Cleveland

Main Contractor(s)

Turner Ozanne VAA JV

Keller Business Unit(s)

Case Foundation

Engineer

Baber & Hoffman, Inc.